IEET Ltd.

Project Details

340 - Floor Finishing

  • Date: 22 Apr 2026
  • Araihazar, Narayanganj
  • Area : 11,785
  • Client : Green Techs Ltd

This floor finishing Project spanned 11,785 SFT at Green Techs Ltd, Araihazar, providing a smooth and strong industrial-grade surface optimized for operational efficiency.