IEET Ltd.

Project Details

A sample of the hardened floor surface

195 - Floor Finishing

  • Date: 13 Jun 2026
  • Tongi, Gazipur
  • Area : 3004
  • Client : Green Tech Ltd

This floor finishing Project at Tongi, Gazipur covered 3,004 SFT for Green Tech Ltd, enhancing surface smoothness and durability.